Bathroom Cabinet Installation Step by Step Tips
A.Before installing the bathroom cabinet, we need to prepare the bathroom cabinet installation tools to avoid subsequent problems.
Need to prepare the tools are: tape measure (for positioning), pen (for marking), electric drill (for drilling, nails), screwdriver (for disassembly and installation), hammer (for the installation of glue particles, nails), glue gun (for gluing and sealing), leveling ruler (for measuring the level).
B.Check the installation environment
Before installing the hanging bathroom cabinet, first check whether the wall is solid, if installed in the hollow wall, not only damage to the wall, there may be a risk of collapse.
Secondly, measure whether the installation size is consistent with the product size, hot and cold water outlets and sewage outlets whether it affects the installation of bathroom cabinets.
2.Specifications for bathroom cabinet installation
Installation steps: assembling the basin - installing the cabinet - installing the basin - installing the mirror - glue sealing
A.Assemble the basin: before installation, you need to assemble the countertop basin, faucet, downcomer and several other parts. The assembly process should pay attention to the interface to do a good job of sealing, in order to prevent late leakage. Basin assembly before the sewer, you need to play a layer of sealant in the mouth of the sewer, there are mold and water leakage prevention role.
B.Installation of the cabinet basin: fix the main cabinet should be parallel and firm, if the main cabinet tilt will lead to a gap in the cabinet door and can not be adjusted. Note that the installation of mirrors or mirror cabinets, to avoid breaking the mirror causing unnecessary damage.
C.Installation of suspended bathroom cabinet downcomer: in order to ensure that there is no leakage, the downcomer is equipped with some glue ring and copper ring. When installing, first install the rubber ring, tighten the copper ring, then connect the sewer pipe, tighten it, and finally put a layer of glue.
D.Installation of bathroom cabinet faucet: extend the faucet hose into the faucet installation mouth, and then use the screws to fix it, pay attention to debugging, installation requirements closely.
E.Determine the wall-mounted cabinet installation position: measure and mark the hanging bathroom cabinet installation position, wall-mounted bathroom cabinets are generally connected to the wall using two screws, so you need to determine the location of the screws, according to the height of the installation and the cabinet nail hole position.
F.Fixed cabinet: drill holes, before connecting the screws, you first need to install the expansion tube in the screw holes, and then screwed into the screws to fix, fix the cabinet, and then put the ceramic on the cabinet, and finally fix the mirror cabinet.
G.anti-leakage measures: undercounter basin installation needs to be glued up and down, to avoid leakage due to irregularities in the basin downspout resulting in poor sealing; downspout shortening fillet at the best wrapped with raw material tape glue.
3.Acceptance of bathroom cabinets after installation
A.Check the mirror cabinet, basin, theme cabinet, side cabinets are vertical and horizontal, and the basin is stable without shaking phenomenon;
B.there is no water leakage, to the water heater drainage is rapid, there is no water, backwater phenomenon;
C.Mirror light open whether normal;
D.After the installation is completed, clean up and place the garbage centrally;